project-managementProfessional – Advanced

Project Management, Project Planning & Project Controls Using Oracle Primavera P6 Professional — International Executive Program

16 hours duration

What You'll Learn

  • ✓Develop a complete Project Execution Plan
  • ✓Build international-standard Work Breakdown Structure (WBS)
  • ✓Create Integrated Project Schedule
  • ✓Develop Logical Network (CPM)
  • ✓Analyze Critical Path
  • ✓Calculate Float Analysis
  • ✓Perform Resource Planning
  • ✓Resource Leveling
  • ✓Cost Loading
  • ✓Cash Flow Forecast
  • ✓Baseline Development
  • ✓Progress Updating
  • ✓Schedule Performance Analysis
  • ✓Earned Value Analysis
  • ✓Delay Analysis
  • ✓Recovery Schedule
  • ✓Executive Reporting Dashboard
  • ✓Primavera Best Practices

Who This Is For

Project ManagerProject EngineerPlanning EngineerSchedulerProject Control EngineerConstruction ManagerSite ManagerCost Control EngineerEPC EngineerProcurement EngineerConsultantOwner RepresentativeGovernment Project Officer

Full Syllabus

011. International Project Management Framework+
  • –Global Project Management Standards
  • –PMBOK 7th Edition
  • –ISO 21502
  • –Agile vs Waterfall
  • –EPC Project Lifecycle
  • –FEED
  • –Engineering
  • –Procurement
  • –Construction
  • –Commissioning
  • –Handover
022. Project Initiation & Project Charter+
  • –Business Case
  • –Feasibility Study
  • –Stakeholder Analysis
  • –Project Success Criteria
  • –Project Governance
  • –Organizational Structure
  • –RACI Matrix
033. Scope Management+
  • –Scope Definition
  • –Deliverable Planning
  • –Work Package
  • –Control Account
  • –WBS Dictionary
  • –Coding Structure
044. Oracle Primavera P6 Fundamentals+
  • –Interface
  • –Enterprise Structure
  • –OBS
  • –EPS
  • –Calendars
  • –Project Creation
  • –User Preferences
055. Activity Development+
  • –Activity Types
  • –Milestones
  • –Activity Coding
  • –Relationships
  • –Constraints
  • –Calendars
066. Critical Path Method (CPM)+
  • –CPM Theory
  • –Forward Pass
  • –Backward Pass
  • –Float
  • –Total Float
  • –Free Float
  • –Longest Path
  • –Critical Chain
077. Resource Management+
  • –Resource Dictionary
  • –Labor
  • –Equipment
  • –Material
  • –Resource Assignment
  • –Resource Histogram
088. Resource Optimization+
  • –Resource Leveling
  • –Resource Smoothing
  • –Over Allocation
  • –Under Allocation
099. Cost Management+
  • –Direct Cost
  • –Indirect Cost
  • –Contingency
  • –Escalation
  • –Cost Accounts
  • –Cost Loading
1010. Cash Flow Planning+
  • –S-Curve
  • –Cash In
  • –Cash Out
  • –Payment Milestone
  • –Progress Billing
1111. Baseline Management+
  • –Baseline Schedule
  • –Baseline Cost
  • –Baseline Resource
  • –Version Control
1212. Progress Tracking+
  • –Physical Progress
  • –Financial Progress
  • –Remaining Duration
  • –Percent Complete
  • –Updating Activities
1313. Earned Value Management (EVM)+
  • –PV
  • –EV
  • –AC
  • –BAC
  • –EAC
  • –ETC
  • –VAC
  • –SPI
  • –CPI
  • –TCPI
1414. Project Controls+
  • –Cost Variance
  • –Schedule Variance
  • –Performance Index
  • –Forecast
  • –Trending
  • –Recovery Plan
1515. Delay Analysis+
  • –Excusable Delay
  • –Non Excusable Delay
  • –Concurrent Delay
  • –Time Impact Analysis
  • –Extension of Time (EOT)
1616. Risk Management+
  • –Risk Register
  • –Qualitative Analysis
  • –Quantitative Analysis
  • –Monte Carlo (Introduction)
  • –Schedule Risk
1717. Dashboard & Executive Reporting+
  • –Primavera Reports
  • –Layout
  • –Filters
  • –Dashboards
  • –KPI
  • –Executive Report
  • –Power BI Integration
1818. Mega Project Case Study+
  • –Project Charter
  • –WBS
  • –Schedule
  • –Resources
  • –Budget
  • –Baseline
  • –Tracking
  • –Earned Value
  • –Delay Analysis
  • –Recovery Schedule
  • –Executive Report
💬 Ada yang ingin ditanyakan?